View Consortium
Y2Q2 Jan 19 - Mar 19
Universitas Gadjah Mada / UGM
2.2.2.3.d Feasibility study (FS) and Detail Engineering Design (DED) for PV and bioenergy system in Bangka Belitung (Semujur Island)
 
 
Institut Teknologi Bandung / ITB, Universitas Bangka Belitung / UBB, Universitas Muhammadiyah Gorontalo / UMG

Developed 2019 by Muhammad Zulfan Zubaidi

+